The hot-water drill system used in the WISSARD project needed to drive enough heat into the ice to melt the hole and continue downward at a significant rate while also making sure the lake was not at risk of being contaminated. The team had to have a system that produces a large amount of high-temperature water in a very concentrated area, so they reached out to Alkota to help build a custom pressure-washing system that could achieve their goals.